Overton Brooks VA Energy Plant
Shreveport Louisiana
Construction of a new 17,260 SF Central Energy Center located on the Overton Brooks VA Medical Center campus in Shreveport, LA. The project features concrete tilt-wall panels and a structural steel frame, supported by concrete foundations and drilled piers, with a TPO roofing system. .Durwood provided gypsum board assemblies, painting of interior finishes, and Industrial coatings on exterior concrete pre cast.
Scope of Work
Division 09 Gypsum Board
Division 09 Paint & Industrial Coatings
Sector
Industrial
General Contractor
Lemoine
Size
17,260 SF
Man Hours
10,000